| Implementation for Cairo Metro Line 2 infrastructure rehabilitation and upgrade |
Egypt |
EBRD |
2026-08-19 |
TBD |
| TC 1 stage 2 Project Implementation Support and Supervision of Construction Works for the |
Egypt |
EBRD |
— |
TBD |
| Project Implementation Support and Construction Supervision Services |
Egypt |
EBRD |
— |
TBD |
| PP3.7 A. Reconstruction Of Bridges At 3 Drain Outlets: Umm Tahoun, Arbaeen, And Al Suyah. |
Egypt |
EBRD |
— |
TBD |
| Investment and an Asset Management Planning Support |
Egypt |
EBRD |
— |
TBD |
| Egypt - ENR 10th Ramadan Railway Link |
Egypt |
EBRD |
— |
TBD |
| Egypt - ENR 10th Ramadan Railway Link |
Egypt |
EBRD |
— |
TBD |
| Egypt - ENR 10th Ramadan Railway Link |
Egypt |
EBRD |
— |
TBD |
| Lot B - Supply of Flow Computers with accessories, Local Field Cabinets, Reporting Systems |
Egypt |
EBRD |
— |
TBD |
| Reconstruction bridge at the following location: a. km 2.270 on Kitchener drain b. km 24.5 |
Egypt |
EBRD |
— |
TBD |
| Implementation, Procurement, Supervision and Environmental Reporting (PIU + Supervision) |
Egypt |
EBRD |
— |
TBD |
| PIU Support, Contract Management, Construction Supervision Consultant - relaunch |
Egypt |
EBRD |
— |
TBD |
| CML 2: Sustainable Urban Transport |
Egypt |
EBRD |
— |
TBD |
| PIU support, Contract Management, Construction Supervision Consultant |
Egypt |
EBRD |
— |
TBD |
| PIU SUPPORT INCLUDING ENGINEERING, DESIGN AND CONTRACTS SUPERVISION |
Egypt |
EBRD |
— |
TBD |
| Project Implementation Support and Supervision |
Egypt |
EBRD |
— |
TBD |
| Procurement Support |
Egypt |
EBRD |
— |
TBD |
| Alexandria Metro |
Egypt |
EBRD |
— |
TBD |
| Alexandria Metro |
Egypt |
EBRD |
— |
TBD |
| PIU SUPPORT INCLUDING ENGINEERING, DESIGN AND CONTRACTS SUPERVISION |
Egypt |
EBRD |
— |
TBD |
| Project Implementation Support and Supervision |
Egypt |
EBRD |
— |
TBD |
| CAIRO METRO LINE 1 MODERNISATION |
Egypt |
EBRD |
— |
TBD |
| Luxembourg-Luxembourg: Technical Assistance to Support Afreximbank in Lending to Trade Inf |
Egypt |
EIB |
— |
TBD |
| Call for External Collaborator – Final Independent Evaluation of the project ‘Combating th |
Egypt |
UNGM |
2026-08-05 |
TBD |
| Call for proposal: Implementing Partner to conduct Vocational Skills Training, Career Guid |
Egypt |
UNGM |
2026-08-15 |
TBD |
| National consultancy: Support UHIA to develop a strategy for the extension of the UHIS to |
Egypt |
UNGM |
2026-08-05 |
TBD |
| International consultancy: International Consultancy Call to Support UHIA to develop a str |
Egypt |
UNGM |
2026-08-05 |
TBD |
| Contracting with a consultancy firm for the provision of technical assistance to develop G |
Egypt |
WB |
2026-10-03 |
TBD |
| Supporting Cost Efficiency and Sustainability Transformation Program in Egypt’s Healthcare |
Egypt |
WB |
2026-09-04 |
TBD |
| Preparation of a Road Safety Plan (RSP) for Public Electric Bus Operations in Greater Cair |
Egypt |
WB |
2026-09-04 |
TBD |